Formwork, Rebar, and Concrete Works at Sohar Free Zone
Client: FreeZoneLocation: Sohar Free Zone, Sultanate of Oman
Scope: Industrial Civil Construction – Formwork, Reinforcement, and Concrete Pouring
Project Overview
Alkhidmah Contracting & Trading SPC was entrusted with delivering critical civil and structural works within the Sohar Free Zone, one of Oman’s most dynamic industrial hubs. The project involved formwork, rebar installation, and concrete pouring for heavy-duty industrial foundations, floors, and structural supports — all designed to meet the high-performance standards required in an industrial environment.
This project highlights Khidmah SPC’s technical expertise and commitment to quality, precision, and safety, ensuring each phase of construction was executed according to international standards and client specifications.
Advanced equipment and skilled manpower ensured uniform concrete compaction, perfect alignment, and flawless finishing, resulting in durable structures built to sustain heavy industrial loads.







Scope of Work
The project scope covered all key phases of reinforced concrete construction, including:
- Formwork fabrication and installation for structural elements such as columns, beams, and slabs
- Reinforcement (rebar) fixing with strict compliance to engineering drawings and load-bearing requirements
- Concrete pouring and finishing using high-grade materials and advanced techniques
- Surface finishing and curing to ensure long-term strength and durability
- Coordination with mechanical and utility works for integrated industrial construction
Each activity was carried out under the supervision of experienced engineers and quality control teams to guarantee dimensional accuracy, strength performance, and safety compliance.
Project Execution
Working within an active industrial zone required precise planning and coordination to ensure uninterrupted progress without affecting adjacent operations. Khidmah SPC implemented a structured execution plan with dedicated teams for formwork assembly, rebar placement, and concrete pouring, supported by continuous quality inspections and testing.
Key Achievements
- Successful execution of multiple concrete foundations and structural elements
- Zero Lost Time Incidents (LTI) — achieved through strict adherence to safety protocols
- Completion within scheduled timelines and client-approved quality benchmarks
- Enhanced the industrial infrastructure within Sohar Free Zone through precision-engineered civil works